86 573 84723001
sales@rhesent.com

Bearing Installation

Installation Attention

  • To keep the bushing, housing dean before installing.
  • The outside surface be covered a little grease or oil during installing, which help the process. And please do not use too much.
  • The bushing should be pushed into housing slowly with mandrel (oil push machine is recommended), it is for hidden to hammer the part directly.
  • We need your instructions if the housing wall is thin or made from soft metal in order not to destroy it.
  • Zn order to simply the installment and keep the working layer, we recommend that the shaft should own chamfer and HRC45/RZZ-3. Gr plating layer is allowed.
  • Grease and Oil are recommended in order to shorten the mending.
Installation Attention    Assemble The Request

Checking Method

  • OD, checked by ring gauge with GO/NO GO
  • ID, checked by plug gauge with GO/NO GO. The common wrapped bushing satisfy tolerance H9.
  • The size of ring gauge & plug gauge are in comply with DIN1494 part 1.